Our dryer stopped working late last year. It took us about a week to fix it, because every time we thought we fixed it, we found out later that we were wrong. We thought the lint traps were clogged, so we vacuumed them out. Then, we pulled out the dryer and cleaned it out from the back, and pulled out a clog in the wall. Next, we went outside (after quite a snowstorm) to see if the vents were open. They were iced shut. We de-iced them by banging them with a broom handle. We went into the attic space above the garage and saw the vent hose sagging in between the joists. The next day, we prepared ourselves to drain them, only to discover that it was solid ice. We tried to shake the ice down, but the flimsy hose fell apart. The day after that, we went to get a new dryer hose and installed it, finally restoring order to our dryer. We also added 2x4s to keep it from sagging again.
What does icy lint look like? Absolutely disgusting.
Thursday, January 24, 2013
Cabinets Part One
I must admit upfront, this is a story with no ending. I stated refinishing the cabinets, which is something I did in the last house. This time, I picked a light cabinet kit instead of dark. My first dilemma was the brilliantly white base coat. The honey oak cabinets did not take kindly to being covered, as it took four coats to get a nice solid base.
Third, I didn't shake the glaze before opening it, so it was a strange peachy orange when I applied it. The picture below shows how different they are shaken and unshaken.
Fourth, once I did shake it an apply it, it was much darker than I expected and hard to apply evenly, given how unforgiving the white base was to inconsistency. Fifth, I didn't like the white with glaze as much as I thought I would. It looks pretty normal in this picture, but in person it looks sorta dirty.
After having it all go differently than expected, i felt that my objectivity was highly impaired. It looked horrible to me. So, I just stopped. I stopped while I debated about what to do. That was two weeks ago.
Part two will be coming sometime soon, that is, as soon as I decide what color to paint and how to go about it. I started only in the bathrooms this time, so I will finish those first before moving onto the kitchen. I haven't completely decided what color to paint the kitchen. I think I might also paint one kitchen cabinet at a time, just to make things a bit easier and work on other stuff in the meantime. This will make the process much longer... which is sad but I think it's the best idea for quality control.
Monday, December 3, 2012
Three Month Review
Just three months ago, we were getting ready to move in. We were still at my old bedroom in my parents house, all of our necessary stuff crammed in there with us; all of our less necessary stuff was crammed in a storage unit. Because I've been here every day, it seems like progress has been slow. Looking back at the pictures helps me realize that this has all happened pretty fast, especially considering I've done a lot of the work myself. I'm not bothered by working alone, as this has become my full time job. I have had help from family and friends, but only at their insistence. They usually appreciate being able to try out some home improvement project at our house before attempting it at theirs.
Again, I most often work without help because I see this as my job, and I will get paid for the work I do when we sell it. However, those renovating to improve the comfort of their home should never be without one thing: help. Sure, it can be done alone, but it sucks. The help of one person is great, three people is probably ideal. Even if there's just someone there to get tools and watch for unexpected issues, that's a great help. If you're not a bit manic (and even if you are) the extra effort required to lift, hold, assemble, and just plain do everything alone can quickly become exhausting. I will work feverishly to get something done, spending 14 hours a day for a few days, then upon completion realize that I am broken. I take a couple days off before the next project, but if I had a job to go back to the next day, it would be disastrous. At our last house, I remember trying to do projects while also working. I tried to paint the kitchen cabinets in two days, and naturally I barely finished and did a horrible job. They stayed like that as long as I was employed, because there was barely time to do them, let alone re-do them.
Anyways, here are some three month pictures from the house, along with a done/to do list. I'll take more official pictures after I clean up the house this week. No room is completely done, which is sort of depressing... but they are all getting close!
Done: new appliances, new flooring, new light fixtures, renovated fireplace, new paint, new blinds and curtains, new vent covers
To Do: new countertops, wall art behind couch, paint cabinets, add new hardware, molding around island, caulk moulding, trim around fireplace, clean or replace fireplace spotlights, hang something over fireplace, add molding at door thresholds
To Do: reattach door molding, caulk molding
To Do: decorate bookshelf, add light switch, caulk molding
To Do: Caulk molding, add design to stair risers, sand front lip of stairs, replace bathroom mirror, paint new light and mirror area, add quarter-round by front door
To Do: paint ceiling and walls, fix shower, paint vanity, change vanity top (maybe), floor molding
To Do: add regular curtains, possibly move in mini-fridge, add lights to closet
To Do: organize closet and desk, hang wall art behind sofa
To Do: outlet covers, re-patch wall, hang art
To Do: molding, paint ceiling and walls, install storage above toilet, paint cabinets, new vanity top, add tile above sink, investigate possible sewer smell :(
Again, I most often work without help because I see this as my job, and I will get paid for the work I do when we sell it. However, those renovating to improve the comfort of their home should never be without one thing: help. Sure, it can be done alone, but it sucks. The help of one person is great, three people is probably ideal. Even if there's just someone there to get tools and watch for unexpected issues, that's a great help. If you're not a bit manic (and even if you are) the extra effort required to lift, hold, assemble, and just plain do everything alone can quickly become exhausting. I will work feverishly to get something done, spending 14 hours a day for a few days, then upon completion realize that I am broken. I take a couple days off before the next project, but if I had a job to go back to the next day, it would be disastrous. At our last house, I remember trying to do projects while also working. I tried to paint the kitchen cabinets in two days, and naturally I barely finished and did a horrible job. They stayed like that as long as I was employed, because there was barely time to do them, let alone re-do them.
Anyways, here are some three month pictures from the house, along with a done/to do list. I'll take more official pictures after I clean up the house this week. No room is completely done, which is sort of depressing... but they are all getting close!
Kitchen/Family Room
Done: new appliances, new flooring, new light fixtures, renovated fireplace, new paint, new blinds and curtains, new vent covers
To Do: new countertops, wall art behind couch, paint cabinets, add new hardware, molding around island, caulk moulding, trim around fireplace, clean or replace fireplace spotlights, hang something over fireplace, add molding at door thresholds
Dining Room
Done: New flooring, new lighting, new paint, new blinds and curtainsTo Do: reattach door molding, caulk molding
Living Room
Done: New flooring, new paint, new blinds and curtains, new thermostatTo Do: decorate bookshelf, add light switch, caulk molding
Stairs and Hallway
Done: new flooring, new paint, removed carpet, painted stairs, installed cabinets over laundry, new water heater, new lightingTo Do: Caulk molding, add design to stair risers, sand front lip of stairs, replace bathroom mirror, paint new light and mirror area, add quarter-round by front door
Upstairs Hall Bath
Done: new flooring, new lighting, new towel bars and toilet paper holdersTo Do: paint ceiling and walls, fix shower, paint vanity, change vanity top (maybe), floor molding
Game Room
Done: new flooring, new paint, track shelving, new vent cover, mounted TV, new blinds and black-out curtain, new sconcesTo Do: add regular curtains, possibly move in mini-fridge, add lights to closet
Guest Room/ Office
Done: new flooring, new paint, new vent cover, additional closet shelf, new blinds and curtainsTo Do: organize closet and desk, hang wall art behind sofa
Master Bedroom
Done: new paint, new lighting, new flooring, new vent covers, blinds and curtains, headboard wall artTo Do: outlet covers, re-patch wall, hang art
Master Bathroom
Done: new lighting, new flooring, new vent cover, new blinds, new towel bars and toilet paper holderTo Do: molding, paint ceiling and walls, install storage above toilet, paint cabinets, new vanity top, add tile above sink, investigate possible sewer smell :(
The Slippery Slope
We intend to remodel this house for profit, but it is still our home in the meantime. Sometimes it's hard to separate what we want from what we should get, because we'll have to live with it until we sell. There are some bigger projects, fueled by Pinterest inspiration, that would be too much of an investment of time and money considering we will move soon. Even if we were staying, its hard to draw the line at what is jsut right and what is excessive. Even stranger, once we have gone over budget on something, there a feeling that we may as well just destroy the budget, because it's already broken. Of course, this is a slippery slope.
I've begun looking at everything as percentages instead of dollars. Though a light fixture may be only $20 over budget, if the original budget was $40, that's a 50% increase. Items as cheap as a couple bucks are still subject to this rule. By ignoring whether or not I think we have the extra money for it and sticking to how much the percentage increases, it's easier to stay on track and not justify unnecessary spending.
I also have to make some sacrifices on what I think it perfect versus what will work. I'm not crazy about our bathroom floors, but they were way under budget and objectively look great. I may not have gotten them if we intended to stay, but they were perfect for updating. Though some of those touches or fancier finishes would be nice and might help sell the house, they are unlikely to increase its value. The common saying "if it isn't broke, don't fix it" has become our motto as we continue to finish renovations. As much as I would like built-ins next to the fireplace, a glass mosaic and steel tile backsplash in the kitchen and a completely new master bath, none of these things are necessary.
I've begun looking at everything as percentages instead of dollars. Though a light fixture may be only $20 over budget, if the original budget was $40, that's a 50% increase. Items as cheap as a couple bucks are still subject to this rule. By ignoring whether or not I think we have the extra money for it and sticking to how much the percentage increases, it's easier to stay on track and not justify unnecessary spending.
I also have to make some sacrifices on what I think it perfect versus what will work. I'm not crazy about our bathroom floors, but they were way under budget and objectively look great. I may not have gotten them if we intended to stay, but they were perfect for updating. Though some of those touches or fancier finishes would be nice and might help sell the house, they are unlikely to increase its value. The common saying "if it isn't broke, don't fix it" has become our motto as we continue to finish renovations. As much as I would like built-ins next to the fireplace, a glass mosaic and steel tile backsplash in the kitchen and a completely new master bath, none of these things are necessary.
Sunday, December 2, 2012
Time Out
Christmas is coming, so most of our renovation funds have gone to gifts lately. Being completely sick of cleaning and organizing, I've turned to completing some unfinished crafts.
I started this t-shirt blanket for my sister ages ago. It's much bigger than I thought it would be. I added bias tape to the edges, but don't like how it tuned out. I'm not sure if I'll buy different tape or just hem it.
I'm also making a T-shirt blanket for myself from all my GameStop T-shirts. I want to make one big enough to cover the Lovesac, but I don't think I have the space to properly construct something of that proportion. I took pictures of every shirt today so I could assemble the design on my computer. I'd prefer to lay it out by hand but I don't have a flat surface that big. Well, not without moving a lot of furniture. I laid a few out on the floor today just to see what they would look like as a blanket.
I made some pillow cases from fabric I had laying around. Aaron received a coffee gift basket that had a folded burlap sack as packaging, and I sewed that into pillows as well. The burlap was a bit unwieldy to sew. I just stuffed in a pillow that no longer matched our decor. The pillow on the left is identical to the one I stuffed into the burlap on the right. They tuned out better than I expected!
I've made quite a few duct tape wallets as well. I've made lots for friends, family, and for myself. I just make them for fun, but I get complements on them often. The typical style I make is pictured below. There's a slot for cash and a hidden pocket behind the three interior pockets on each side. I intend to sell some online sometime soon, probably on Etsy. I need to do a little more research and set up accounts to make that possible, so that may be a while.
Wednesday, November 28, 2012
Bathroom Flooring Part Two
I moved on to installing flooring in the master bath today. I started by cleaning the existing vinyl, which was disgusting. I cleaned the other bathroom's floor, but it wasn't nearly as dirty. Just like anything else, the floor looked a lot better once it was clean. The cleaner I used worked great, but it was toxic. Despite being late November in Indiana, I opened the window for air.
Laying the floor was even quicker than yesterday. I was done in a couple of hours. All that's left is quarter round and doorway transitions.
Even though knew the toilet in the master bath would be hard to move, I uninstalled it by myself. I figured that not needing to lift it into a tub would make the task manageable. I would have been correct if the bolt wasn't rusted on.
After a big mess in the shower and a lot of WD40, the bolt was freed. Harder than that was reinstalling the toilet. I made another mess but got it back on. It flushes fine, but Aaron and I will probably keep an eye on it. The hall bath toilet is still in the tub waiting for Aaron's next day off.
Tuesday, November 27, 2012
Bathroom Flooring Part One
We bought vinyl plank flooring the for the upstairs bathrooms at Home Depot on Black Friday. I'm not crazy about the color or wood grain, but it was half off and we aren't picky. I installed it in the hallway bathroom today. I made a bit of a mess in the process, but got it done pretty quick.
I moved the toilet by myself, which was ill-advised and very difficult. I'm not confident I can it back out of the tub on my own. We installed a stick-down vinyl plank for my grandmother a few weeks ago. It was easy, but the glue got an over our hands and the seams did not get as tight as I would have liked. That floor was only 99¢/sq ft, so it's a great option for cheap and fast update. However, that is also what we paid for these floors on Friday.
The box says "easiest floor ever" and I just might agree. Overlapping flaps stick to adjacent planks, making it a floating floor. It was a lot easier to put down than click-together flooring, especially around the door frame. My fingers often hurt after installing tongue-and-groove or click-together floors from trying to pull the seams tight. The planks could be repositioned after placement as long as I didn't push down too hard. To cut the floors, you score the front with a utility knife & snap it. This works for curves too, making the cut around the toilet drain a cinch.
Even though I don't love the pattern on the floor, it looks good finished. I'm now more motivated to get the vanity painted; its basically the same color as the new floors.
Subscribe to:
Posts
(
Atom
)

































